NHAI Aurangabad alloted us designing of 80 km road in Aurangabad Maharashtra - 07/25/2016
NHAI Aurangabad alloted us designing of detailed project Report of selected stretches/corridors of Road Network in the state of Maharashtra for Up-Gradation to Two Lanes with paved shoulder/ Four lane configurations (Ghogaspargaon-Phulsangvi-Ukhadachakla-Dahiwandi-Shirur-Rakshasbhuvan-Kholyachiwadi-Koregaon-Dongarkini-Chumbli-Patoda-DigholRoad(SH-62).
(Tentative Length 80.00 km.)
PWD Dadri alloted us designing of 157 km road in dadri district - 03/03/2016
PWD Dadri alloted us designing of preparation of detail project report for widening from existing width to 2 lane with shoulders/strengthening/raising including design of bridges/CD works of (1)Bhiwani Kaunt Umrawat Sanga Sanjarwas Ranila Achina upto NH-334B in Bhiwani Distt. (Length 34.200 KM), (2). Sanwar Manheru Kitlana Chappar Barsana Mor upto NH-334B in Bhiwani Distt. (Length 26.600 KM) (3) Dadri (SH-17) to Kalyana to Jhojju Kalan (HSAMB) (MDR-126) (Road ID 2387) (Length 12.600 KM) and (4) and Tosham Behal Sodhiwas road (SH-12) in KM 178.50 to 201.90 in Bhiwani Distt. (Road ID 2465) (Length 23.400 KM). Total Length of road for whichDPR is prepared is 157.00 km.