List of Roads

 Home / List of Roads

List of Roads

SR NO. Name of the Project Location of the Project Total Project Cost Name, Address of Client Type of Structure of Approaches and Railway Bridge (PSC/STEEL/ COMPOSITE GUARDER
1. Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of Road Networks in the State of Maharashtra for up-gradation to Two Lanes with paved shoulder /Four lane configurations. (Package-Highway Starting from Junction of NH-222 near Parbhani Connecting to Gangakhed-Isad-Kingaon terminating at Nalegaon junction of NH-361.). (Tentative Length 130.00 km.) Maharashtra 1560.0 crore The Superintending Engineer, National Highway Circle, Aurangabad Topographical survey with total Stations, Carrying out CBR Test, Benkelman Beam Test, Traffic Census (Classified Traffic Volume Count), Design of bridge, design of road in MX Road software and Cost Estimate including unpriced BOQ and Proof checking
2. Consultancy Service for preparation of detailed project Report of selected stretches/corridors of Road Network in the state of Maharashtra for Up-Gradation to Two Lanes with paved shoulder/ Four lane configurations (Ghogaspargaon-Phulsangvi-Ukhadachakla-Dahiwandi-Shirur-Rakshasbhuvan-Kholyachiwadi-Koregaon-Dongarkini-Chumbli-Patoda-DigholRoad(SH-62). (Tentative Length 80.00 km.) Aurangabad 965.20 Crore The Superintending Engineer, National Highway circle, Aurangabd Topographical survey with total Stations, Carrying out CBR Test, Benkelman Beam Test, Traffic Census (Classified Traffic Volume Count), Design of bridge, design of road in MX Road software and Cost Estimate including unpriced BOQ and Proof checking
3. Preparation of Feasibility and Detailed project report including soil investigation, topographical survey evolving structural design, drawings, detailed estimate including bill of quantities and proof checking for construction of BYE PASS (GREEN FIELD ALIGNMENT) FROM SONEPAT-PURKHAS ROAD TO DELHI PARALLEL LINK CHANNEL AND STRENGTHENING OF EXISTING ROAD ON THE DELHI PARALLEL LINK CHANNEL IN SONEPAT DISTRICT BANK OF CANAL INCLUDING DESIGN OF ROB AND HIGH LEVEL BRIDGE ON DELHI PARALLEL LINK CHANNEL IN SONEPAT DISTRICT Length of road = 4.46 Km Length of BRIDGE=26.49 LENGTH OF ROB = 795.00m DELHI PARALLEL LINK CHANNEL IN SONEPAT DISTRICT 47.98 Crore The Deputy General Manager-III Haryana State Roads & Bridges Development Corporation Ltd., Sonepat Ph: 0130-2200346 Preparation of DPR, Topographical survey with total Stations, Carrying out CBR Test, Benkelman Beam Test, Traffic Census (Classified Traffic Volume Count), Design of bridge, design of road in MX Road software and Cost Estimate including unpriced BOQ and Proof checking
4. Consultancy services for preparation of detail project report for widening from existing width to 2 lane with shoulders/strengthening/raising including design of bridges/CD works of (1)Bhiwani Kaunt Umrawat Sanga Sanjarwas Ranila Achina upto NH-334B in Bhiwani Distt. (Length 34.200 KM), (2). Sanwar Manheru Kitlana Chappar Barsana Mor upto NH-334B in Bhiwani Distt. (Length 26.600 KM) (3) Dadri (SH-17) to Kalyana to Jhojju Kalan (HSAMB) (MDR-126) (Road ID 2387) (Length 12.600 KM) and (4) and Tosham Behal Sodhiwas road (SH-12) in KM 178.50 to 201.90 in Bhiwani Distt. (Road ID 2465) (Length 23.400 KM). Total Length of road for whichDPR is prepared is 157.00 km. Bhiwani, Haryana The Executive Engineer Provincial Division, PWD B&R Br., Charkhidadri Ph: 01250-220073 Flexible and rigid pavement
5. Consultancy Services for Preparation of Detailed Project Report, Detailed Project Report including survey, design of pavement, bridges, cost estimate and proof checking for Upgradation of Various Roads in REWARI Division Lenth = 55.17 Km Rewari, Haryana 129.87 Crore The Executive Director, Haryana State Roads & Bridges Development Corporation Ltd. Panchkula, Ph: 0172-2585265 Flexible and rigid pavement
6. Consultancy services for widening & strengthening of Gohana to Saffidon road evolving feasibility report, DPR, design of flexible pavement and cost estimate from Km 116.680 to Km 131.770 in Sonepat distt. Lenth = 15.09 Km Gohana to Saffidon road 1.65 Crore The Executive Engineer,Provincial Division No I, PWD B&R, Br. Sonipat Ph: 0130-2214601 Flexible Pavement
7. Construction of Additional 2 lane Railway over bridge in Km. 1.80 to 2.240 with four laning in km 3.00 to 15.00 (Ambala City) of Ambala Hissar Road, NH-65 Length = 12.00 KM K.m 1.80 to 2.24 of N.H.65 27.62 Crore The Executive Engineer, Provincial Division no. III, PWD B&R Br. Karnal. Ph. No 0184-2265961 R.E. wall, RCC wall and composite Girder monolithic structure voided slab
Copyright © All rights reserved. Designed & Developed by GMark Technologies